One system, four reasons to call

The battery is always the same. What differs is where you are starting from: with or without a connection, with or without a grid-operator contract on the table.

Which situation do you recognise?

01

Expand a connection

You have a connection, but it is too light for what you want — and upgrading is either impossible or years away. A battery absorbs your peaks, letting you use far more capacity than your contract allows, with nothing about the connection changing.

Who it is for: Businesses with an existing connection that cannot be upgraded in time: manufacturing, workshops, distribution centres and companies looking to electrify.

Power
From 125 kW, up to 10+ MW
Cost
Buy, or from €975 per month as a service (125 kW)
Lead time
About 3 months from signature to running
02

New connection

You have no connection yet, or not the capacity you need, and you are in the queue. The way out almost always runs through a restricted offer from the grid operator — and a battery is what makes that offer usable after all.

Who it is for: Developers and business owners realising a new site or scaling up sharply, who are told by the grid operator that there is no room for the time being.

Power
100 kW to 10+ MW
Cost
Buy, or from €1,350 per month as a service (125 kW)
Lead time
6–18 months, depending on grid operator and offer

Or is this you?

Not sure which route fits?

The capacity check works it out from your own figures.

Run the capacity check

Tell us your situation

Brief is fine. Within days you will hear what is possible at your site.