Capacity check
What would a battery deliver at your site?
Four fields from your grid invoice and you get an indication straight away: how much extra capacity you gain, what it saves on grid charges, and what is left at the bottom. Nothing to hand over first.
Your indication
- Usable capacity afterwards
- —
- Recommended battery size
- —
- Saving on grid charges
- —
- Cost of the battery
- —
- Bottom line
- —
Expected lead time—
This is an indication based on average tariffs, meant to tell you whether a proper calculation is worth doing. The real business case depends on your load profile, your grid operator and the offer on the table.
Want this calculated properly?
We turn it into a substantiated business case based on your actual load profile. The figures you entered come along.
Get it calculated properly