Grid capacity for business

More capacity, lower grid costs.Without waiting ten years.

A BAT3 battery takes the peaks out of your load. That gives you more capacity behind the same connection, cuts your grid bill, and makes a restricted connection from the grid operator behave like an unrestricted one. Buy it or take it as a service — your call.

Lead time

How long does it actually take?

It comes down to one thing: whether there is already a connection to build on.

  • Waiting for a grid upgrade

    up to 10 years

    The queue in most congestion zones. Free, but your project stands still.

  • New or heavier connection with BAT3

    6–18 months

    Depending on what the grid operator offers and how quickly terms are settled.

  • Expanding behind your existing connection

    ± 3 months

    Nothing about your connection changes, so you never enter the queue.

The problem

The grid is full. Your order book is not.

Across much of the Netherlands, a heavier or new connection means years of waiting. For manufacturing, logistics and property development that translates into no extra machines, no charging points, no new building. The project stalls while the market moves on.

Meanwhile the grid operator arrives with contracts of its own — a CSC, a biedplichtcontract, blokstroom — whether you are in the queue or have had a connection for years. They sound like a catch: you get room, but not always at the moment you want it. That is exactly the problem a battery solves.

  • You cannot add machines or charging points to your current connection.
  • You are in the queue for a new or heavier connection.
  • You have been offered a restricted contract and do not know whether to sign.

Why BAT3

A battery is engineering. What we deliver is certainty.

You are not buying hardware, you are buying usable capacity. Everything in between is our problem.

Usually positive from day one

Your grid charges are driven by the capacity you contract. Bring the peak down and that bill comes down — every month. For many businesses the saving already covers most of the system.

We turn the contract into engineering

A CSC, biedplichtcontract or blokstroom is an agreement on paper. We build the control that executes it, guard the limits and handle the call-offs. Your production never notices.

Buy or subscribe

Want it on the balance sheet? Buy it. Want to keep your capital free? We will own it. Either way we design, install and manage the system.

One party, from check to management

Hardware, permits, installation, dealing with the grid operator and 24/7 monitoring all sit with us. One point of contact, one invoice.

Buy or subscribe

Two ways to get a battery

The engineering is identical; the difference is whose balance sheet the system sits on. Both can work — which is better for you depends on your capital position and your tax position.

As a service

We finance, install, manage and monitor the system. You pay a fixed monthly fee and keep your capital available for your own business. No residual-value risk, no maintenance budget.

  • No upfront investment
  • Fixed monthly fee
  • We carry the technical risk

Buy it

You invest and you own it. Over the lifetime this is usually the lower cost per kWh, and the investment often qualifies for the Dutch EIA tax scheme. Design, installation and management still sit with us.

  • Lowest lifetime cost
  • Possible EIA tax benefit
  • Management still ours

How it works

From stuck to running, in six steps

Within days you know whether it pays off. After that, the lead time depends on your situation.

  1. 1

    Capacity check

    We analyse your connection and your load profile. Within days you know whether our solution pays off at your site — and if it does not, we will say so.

  2. 2

    The business case

    You receive a proposal as a purchase and as a service, so you can put them side by side. We calculate exactly what your grid charges become, our services included.

  3. 3

    Dealing with the grid operator

    If a CSC, biedplichtcontract or blokstroom is on the table, we assess the terms and size the battery against them. If you have nothing yet, we apply on your behalf.

What brings people here

Why businesses call us

It rarely starts with a battery. It starts with a plan that does not fit the connection.

Charging points and fast charging

A charging hub for trucks or fleet vehicles draws exactly the peak your connection cannot take.

Electrifying your process

New machines, an electric oven, heat pumps — and the contracted capacity is gone.

New build or a new site

The building is scheduled, the connection is not. The battery turns the capacity you were promised into capacity you can use.

Using your own solar

Generation you currently export at an unprofitable rate shifts to the moment you actually need it.

Frequently asked questions

The questions we get most

What does a BAT3 battery system cost?

You can buy it or take it as a service. As a service, expanding an existing connection starts at €975 per month for 125 kW; a new connection starts at €1,350 per month. If you buy, the investment is higher but the lifetime cost is usually lower, and the investment often qualifies for the Dutch EIA scheme. We put both side by side.

The grid operator is offering me a CSC. Should I sign?

A capaciteitssturingscontract has been the successor to the CBC since May 2026 and is often the fastest route to capacity: if you are in the queue, it lets you agree temporary extra capacity. The question is not whether to sign but whether you can bridge the agreed moments. With a correctly sized battery you can, without your production noticing. Have it worked through before you sign.

How quickly can the system be running?

If you already have a connection, about three months after signing is realistic; work on site usually takes a single day. If a new or heavier connection is needed, allow 6 to 18 months — depending on your grid operator and on what is possible in your grid area.

Shall we work out what is possible at your site?

Run the capacity check and see an indication of your saving and your extra capacity straight away. No obligation, and no details required.

Run the capacity check

Tell us your situation

Brief is fine. Within days you will hear what is possible at your site.

What is it about?(select any that apply)

We use your details only to answer your request. Nothing is stored in a database and nothing is shared with third parties.